Company News
Latest updates of our factory, patents and overseas delivery projects
What Size Carton Erector Do You Need? A Complete Box Size Checklist
Ordering a carton erector around a single box size is a mistake that shows up the first week…
Read More
Standardizing Corrugated Box Dimensions to Optimize Machine Efficiency
Every box size change costs time. The carton erector stops, an operator adjusts handwheels, the glue pattern shifts,…
Read More
Workshop Layout Optimization Solutions to Maximize the Operating Efficiency of Carton Forming Machines
The 47 Steps That Were Killing Production During a site audit at a frozen food packaging plant in…
Read MoreZRAY Helps Frozen Food Logistics Provider Boost Box Erecting Efficiency in Cold Storage Environments
Case study | August 2026 A frozen food logistics provider in Northern Europe operates a cold chain that…
Read More
Step-by-Step Guide: Resetting Sensor Alignment on Automatic Erectors
Sensors tell an automatic carton erector where the blank is, whether the folds happened, and when to fire…
Read MoreZRAY Announces Smart Carton Erector Integrated with Servo-Driven Mechanical Flap Folding
News release | August 2026 ZRAY has introduced a new smart carton erector generation built around servo-driven mechanical…
Read MoreIndustry Technical Blogs
Practical guides to help you select, operate and maintain carton forming machines
Medical Device Master Case Erecting and Sealing: Cleanroom Compliance at ISO Class 7 and 8
A master case station in a medical device plant is not a packaging station. It is the last…
Read MoreHot-Melt Glue vs. Tape Sealing for Bottom Sealing: Cost per Case & Bond Strength Data (Up to 40 CPM)
Bottom sealing looks like a decision made once when the machine is purchased and never revisited. On an…
Read MoreHumidity and Case Erecting Performance: Adapting Settings from 30 to 80 Per Cent RH
Humidity is the variable that explains most of the machine problems that appear without anything having been changed.…
Read MoreCase Erector Suction Cups Not Picking Up Blanks: Eight Causes and Their Fixes
A suction cup that will not pick a blank looks like a vacuum problem. About half the time…
Read MoreAuto-Tape Change Case Erectors: Eliminating Tape Micro-Stoppages on 24/7 Production Lines
A tape roll runs out every 60 to 70 metres of case seam. On a line producing 35…
Read MoreMaintenance Checklist for Automatic Case Erecting Machines: Shift to Annual
A case erecting machine is one of the most maintenance-forgiving machines on a packaging line, and one of…
Read MoreSubscribe To Get Latest News & Technical Guides
Leave your business email to receive free industry articles and new product updates