Company News
Latest updates of our factory, patents and overseas delivery projects
ZRAY Announces Next-Gen Carton Erectors (40 CPM, AGV/AMR Ready, Modbus TCP / EtherNet-IP) for Autonomous Factory Integration | ZRAY
Manual feeding is the weakest link in a lights-out cell: one empty magazine stops the line every 6…
Read MoreZRAY Debuts Stainless Steel Carton Erecting Machine (IP65/NEMA 4X, AISI 304, 20–25 CPM) for Wet and Washdown Environments | ZRAY
Washdown floors in food and beverage plants destroy a carbon-steel case erector in 12–18 months. Condensate, high-pressure rinse…
Read MoreZRAY Adds IoT Remote Diagnostics (Modbus TCP, OPC UA, MQTT) to Industry 4.0 Case Erectors up to 40 CPM | ZRAY
A case erector that stops at 02:00 Saturday and waits for Monday service can idle a line for…
Read MoreZRAY Introduces Pharmaceutical Box Erecting and Sealing Equipment (60–80 boxes/min, HEPA H13, GMP) with Zero-Dust Operation | ZRAY
Pharmaceutical cartoning has zero tolerance for loose fibre or paper dust. A single stray particle settling on a…
Read MoreZRAY Unveils Specialized Automatic Case Erector (40 CPM, 24,000 Bottles/h Line Match) for High-Speed Beverage Bottle Canning Lines | ZRAY
A beverage canning line filling 24,000 bottles per hour empties a case erector faster than most machines can…
Read MoreZRAY Launches Compact High-Speed Case Erector (25 CPM, 3.22 m² Footprint) for Small Packaging Floors | ZRAY
Floor space is the one resource a packaging engineer cannot order more of. In a retrofit, a leased…
Read MoreIndustry Technical Blogs
Practical guides to help you select, operate and maintain carton forming machines
Heavy-Duty Case Formers for 50 lb (23 kg) Freight: Preventing Bottom Drop-Outs on Double-Wall Board
A case that fails at the bottom does not fail gently. A 50 lb (23 kg) load dropping…
Read MoreErecting Low-Grade and Thin Corrugated Board: Settings for Recycled and Lightweight Grades Below 1.5 mm
Thin board is not a defect. It is a deliberate cost decision that saves 12 to 20 per…
Read MoreReducing Changeover Time on Multi-Size Case Erecting Lines: SMED Applied to Packaging
Changeover time is the only machine parameter that costs money without producing anything. Every minute of it is…
Read MoreSquareness Problems in Case Erecting: Root Causes and How Servo Drives Correct Them
Squareness is the property that decides whether an erected case runs cleanly through the rest of the line…
Read MoreIndustry 4.0 on Case Erectors: IoT Sensor Sets, Data Thresholds and Predictive Maintenance Payback
Predictive maintenance on a case erector has a reputation problem, and it is deserved. Most installations fail not…
Read MoreTotal Cost of Ownership (TCO) for Industrial Packaging Machines: A 10-Year Cost Model at 40 CPM
Procurement teams still screen case erectors and case formers almost entirely on the sticker price. That habit quietly…
Read MoreSubscribe To Get Latest News & Technical Guides
Leave your business email to receive free industry articles and new product updates