ZRAY Introduces Turnkey Packaging Line Integrating Automatic Case Erectors and Loaders (Up to 40 CPM, OEE ≥85%) | ZRAY

September 17, 2026

Most packaging lines fail not at the machine, but at the seams between machines: a 40 CPM erector starves a 30 CPM loader, or a palletiser backs up and chokes the sealer. ZRAY’s new turnkey packaging line closes those seams by engineering the whole cell — automatic case erector, carton loader, sealer, labelling, checkweighing and palletiser — as one controlled system rated at up to 40 CPM with a line OEE target of ≥85%. One supplier, one FAT, one warranty, one service number.

Line Composition and Beat Matching

Every station is sized with a 10–15% speed margin over the bottleneck so a single slow head never stops the cell. Buffers sit between married stations to absorb micro-stops.

Station Speed Buffer / note
Case erector (ZR-40H) 40 CPM Magazine 5–8 min stock
Carton loader / unloader 42 CPM Infreed accumulator 6 cases
Case sealer 40 CPM Hot-melt or tape
Label / inkjet coder 45 CPM Bypass on fault
Checkweigher 50 CPM Reject lane
Palletiser 40 CPM Slip-sheet, 1.2 t/h

On a 40 CPM main line the loader and coder are specified 5–10 CPM above the erector, and the checkweigher runs faster still so rejects never stall the flow.

Line Control Architecture

A master line-control PLC owns the sequence; a 7″ overview HMI and optional SCADA show live CPM, alarms and OEE. Stations talk over Modbus TCP / PROFINET, the line auto-de-rates when any station becomes the bottleneck, and jam detection at each transfer drops the upstream feed. The E-stop chain is series-wired across the whole cell, so one pull stops everything in the defined zone.

Capacity and Efficiency Targets

Metric Target
Line OEE ≥ 85%
Speed margin per station 10–15% over bottleneck
Bottleneck auto-de-rate Yes, real-time
Mean micro-stop recovery < 30 s with auto de-jam

A 10–15% margin is the difference between a line that hits nameplate and one that loses two shifts a week to cascade stops. The erector’s restart-capable PLC logic restores the full sequence after a jam without manual reset.

Project Flow

Step Deliverable
1. Requirement study Carton range, CPM, layout constraints
2. Concept & layout 2D/3D plant drawing
3. Quotation & contract Fixed scope, lead time
4. Design confirmation Sign-off drawings
5. Build & FAT Factory acceptance test
6. Shipment Crated, incoterms agreed
7. Install & SAT On-site commissioning
8. Training Operator + maintenance
9. Acceptance Handover & warranty start

Turnkey Scope

The package covers equipment, electrical, pneumatic and conveyor integration, a critical spares kit, full documentation, on-site installation and commissioning (шеф-монтаж и пусконаладка), operator and maintenance training, and a 24-month warranty. One interface means no finger-pointing between the erector and the palletiser.

Common Pitfalls We Pre-Engineer

Pitfall ZRAY action
Carton tolerance drift Infeed gauge set to board + 0.5 mm
Low ceiling / no crane Modular split frames, fork-lift build
Air capacity short FRL sized to 150 NL/min peak
Uneven floor Height feet + laser re-level
Grid fluctuation 380 V/50 Hz with 220 V/60 Hz option, surge guard

Line Maintenance Schedule

Interval Tasks
Daily Drain all FRL bowls; check CPM vs target; test E-stop chain; clear reject lane
Weekly Lubricate conveyors; clean coders; verify buffer sensors; belt tension
Monthly Calibrate checkweigher; replace vacuum filters; torque frame bolts; backup PLC
Quarterly Replace suction cups; grease gearboxes; verify PROFINET I/O; inspect palletiser
Annually Gearbox oil; bearing swap; insulation test; full SCADA review; OEE audit

Working with ZRAY

Review the full ZRAY product range for the cell that fits your carton and CPM. Our support team handles FAT, SAT and spare-parts planning, and you can contact ZRAY directly to start a requirement study and layout drawing.

Get a Quotation for Your Packaging Line

Send us your carton size range, board grade and required CPM — our engineers will return a model recommendation, layout drawing and quotation within 24 hours.

Contact ZRAY: [email protected] · WhatsApp +86 13681839278

Want To Know More About Our Upgraded Machines?

Send your carton specifications and output demand, our engineer will provide free technical scheme & quotation



    Subscribe To Get Latest News & Technical Guides

    Leave your business email to receive free industry articles and new product updates