ZRAY Shortens Lead Times (15–20 Days Standard, 35–45 Days ODM) and Streamlines Shipping Costs for Global Case Erector Orders | ZRAY

September 15, 2026

A 45-day wait for a case erector can stall a line-expansion project by a quarter, and a mis-quoted freight term can add 15–20% to landed cost overnight. ZRAY has re-sequenced production and containerisation so standard models ship in 15–20 days and even full ODM projects close in 35–45 days, with transparent EXW/FOB/CIF/DDP options so procurement teams can budget landed cost before the PO is signed.

Lead Time by Configuration

Configuration Lead time Notes
Standard model 15–20 days ZR-40H / ZR-25S in stock kits
Light customisation 25–30 days Guarding, HMI language, height
Full ODM 35–45 days New frame, tooling, CE file
Spare parts 3–5 days From Shanghai warehouse

Container Loading and Freight

Packing 20GP 40HQ
Units per container 6 machines 14 machines
Net / gross weight 680 kg / ~780 kg same per unit
Mode Crated whole Crated whole or knocked-down

Knocked-down (KD) shipping cuts volume ~40%, lifting 20GP capacity from 6 to 9 units and often turning an LCL into a worthwhile FCL. For most buyers an FCL 40HQ is cheaper per unit than LCL once volume exceeds 4 machines. The crated whole option ships ready to commission; the KD option saves freight but adds 2–3 hours of on-site assembly.

Trade Terms and Risk

Term Freight to port Risk point
EXW Shanghai Buyer Export clearance on buyer
FOB Shanghai/Ningbo ZRAY to port On-board handover
CIF ZRAY + sea Insurance split
DDP ZRAY to door ZRAY clears import

Export Documents Supplied

Document Purpose
Commercial invoice Customs value
Packing list Load verification
Bill of lading Title of goods
CE DoC EU compliance
Certificate of origin Tariff preference
ISPM 15 mark Treated crate wood

Core Specifications (Reference Model)

Parameter ZR-40H
Speed up to 40 cartons/min
Carton L × W × H 250–550 × 200–400 × 150–500 mm
Board 3–9 mm, 3/5-layer, flute B/C/E/BC/EB
Power 3.0 kW, 380 V/50 Hz 3-ph
Air 0.5–0.6 MPa, ~150 NL/min
Control Mitsubishi FX5U + 7″ HMI

Commissioning Alarm Codes

Code Description Field action
AL-02 Magazine empty Reload at acceptance
AL-07 Safety circuit open Close guard, reset relay
AL-09 Air pressure low Check FRL, drain trap
AL-10 Encoder / comm fault Reseat connector

Preventive Maintenance

Interval Tasks
Daily Drain FRL; verify 0.5–0.6 MPa; test E-stop
Weekly Clean sensors; check belt tension
Monthly Replace vacuum filter; torque bolts
Quarterly Replace cups; grease gearbox
Annually Change gearbox oil; insulation-test panel

Plan Your Order and Freight

Peak season (Aug–Oct) fills our line six weeks out, so release the PO by May for a Q3 start. Share your destination port and volume and our Contact team will quote landed cost under your preferred term; the same model’s layout drawing and CE file are on our Downloads page for your engineering review.

Get a Quotation for Your Packaging Line

Send us your carton size range, board grade and required CPM — our engineers will return a model recommendation, layout drawing and quotation within 24 hours.

Contact ZRAY: [email protected] · WhatsApp +86 13681839278

Want To Know More About Our Upgraded Machines?

Send your carton specifications and output demand, our engineer will provide free technical scheme & quotation